UK Oil & Gas plc reported the start of preparations, with access and well pad strengthening and repair, at the Pinarova-1 oil well site in Turkey.
PERMITS
The service provider PSI’s wireline equipment and operator partner Aladdin Middle East’s swab testing unit will then follow.
In December 2023, the 50-50 joint venture received the required explosive permits to use the larger 7″ perforating guns over the Germik/Hoya section.