Equipment & Logistics News Oil & Gas

UKOG completes phase I seismic at Basur

UK Oil & Gas plc (UKOG) announced the completion of Phase I 2D seismic acquisition over the target area and trajectory of the proposed Basur-3 (B-3) mechanical sidetrack (B-3S), onshore Turkey. BASUR-RESAN UKOG’s wholly owned subsidiary, UKOG Turkey Ltd, holds a 50% non-operated interest in B-3 and the surrounding 305 km² Resan M47-b1, b2 licence […]

News Oil & Gas

UKOG to develop geothermal hub at Horse Hill oil site

UK Oil & Gas plc announced it aimed to develop a geothermal energy hub (GeoHub) on part of its oil production site at Horse Hill near Gatwick, Surrey. JOINT VENTURE UKOG added it envisaged continuing oil production at Horse Hill to the end of economic life before repurposing boreholes and transforming the site into 100% […]

Equipment & Logistics News Oil & Gas

UKOG to complete Phase I of 2D seismic ahead of drilling at Basur-Resan JV

UK Oil & Gas plc (UKOG) said that the first tranche of 2D seismic acquisition is due to be completed within Q2 2022 at its Basur-Resan 50% joint venture in Turkey. SEISMIC The company holds a non-operated interest with partner and operator Aladdin Middle East (AME). During August, AME temporarily halted drilling of the proposed […]

Equipment & Logistics News Oil & Gas

UKOG JV pauses drilling at Basur-3 for new seismic acquisition

UK Oil & Gas plc’s joint venture (JV) partner has paused drilling for new seismic data after a directional drilling assembly became stuck in Basur-3 (B3) appraisal oil well in Turkey. DEVIATED SIDETRACK The directional drilling assembly became stuck after the well reached a drilled depth immediately above the Garzan and Mardin targets, which remain […]

News Oil & Gas

UKOG granted extension to drill at Horse Hill

UK Oil & Gas plc (UKOG) has been granted a two-year extension to drill in its licences at Horse Hill oil field near Gatwick, southeast England. The company said that the Oil & Gas Authority gave approval to the remaining drilling deadlines at PEDL137 and PEDL246 in response to Covid-19. These are needed to satisfy […]