Hummingbird Resources plc announced that its joint venture partner Pasofino Gold Ltd had estimated costs of US$435 million to start the 2,559 km2 Dugbe gold project in southern Liberia. PRODUCTION The figure is part of the Pasofino’s filed feasibility study (FS) for the project, which comprises two defined deposits of Tuzon and Dugbe F. Pasofino’s […]
Tag: Tuzon deposit – Dugbe – Liberia
Hummingbird reports first drill results from Dugbe
Hummingbird Resources plc has received the first drill results from its Tuzon deposit at the Dugbe gold project in Liberia. The joint venture comprises Pasofino Gold Ltd which has an earn-in agreement for a 49% stake in the project, with Hummingbird owning 51%. Three of the four holes are ‘step-out’ holes to test the lateral […]
Hummingbird notes new targets at Dugbe
Hummingbird Resources plc announced that new targets had been identified at Dugbe gold project in Liberia. The company’s joint venture partner Pasofino Gold Ltd conducted trenching on strike from the Tuzon deposit at the site. Results show a six-km long gold in soil trend extending south-westwards on strike from the 2 million oz (indicated mineral […]