Serica Energy plc has lowered full year production forecast after an “issue” with the Triton floating production storage and offloading (FPSO) vessel suspended its North Sea operations. GAS The company said that the problem was with one of the compressor seals, with repairs expected to take two to four weeks. The outage follows resumption of […]
Tag: Triton area
Serica notes stable production at Bittern B6
Serica Energy plc said production had stabilised from the Bittern field B6 well in the Triton Area, UK central North Sea. GUIDANCE On 11 September, the well began initial flowback to the Triton floating production storage and offloading vessel. Oil and gas are recorded at a combined gross rate of around 8,000 boepd, net 5,200 […]
Serica to develop Belinda field
Serica Energy plc has received final regulatory approval to develop its 100% owned and operated Belinda field in the Triton area of the UK central North Sea. TRITON The company plans to drill the development well in the first half of 2025, before tying back the field to the Triton FPSO, with production due to […]
Serica reserves rise from Triton and Bruce
Serica Energy plc announced an increase in oil and gas reserves based on independent estimates for the company and its acquisition Tailwind. FACTORS As at 31 December 2022, pro-forma proved plus probable (2P) reserves had risen to 130.4 mmboe compared with 104.0 mmboe on 31 December 2021. The company said that the net increase was […]