Equipment & Logistics News Oil & Gas

Angus production rises 75% with second compressor

Angus Energy plc has increased production by more than 75% with the planned commissioning of the second compressor at Saltfleetby gas field in east Lincolnshire. MILESTONE Dual compressor mode began on 10 May and the three producing wells of B2, A4 and the new B7T, have since been flowing gas to the National Grid at the […]

News Oil & Gas

Angus commissions B7T sidetrack at Saltfleetby

Angus Energy plc this morning commissioned the recently drilled B7T sidetrack well at Saltfleetby gas field in east Lincolnshire. TEMPORARY FLOWLINE The company connected the well by a temporary flowline to the production facilities on the site and processed gas is being delivered to the National Grid. “At present the well is flowing at approximately […]

News Oil & Gas

Angus completes initial B7T clean-up at Saltfleetby

Angus Energy plc has completed the initial clean up of the new B7T well at Saltfleetby in Lincolnshire. PRODUCTION The company said that the well was producing from an approximately 185m horizontal section in the main Westphalian reservoir at a vertical depth of 2292m. Following first production on 31 March the company has been cleaning […]

News Oil & Gas

Angus fully commissions second compressor

Angus Energy plc reported that the second compressor was now fully commissioned and processing gas for export at Saltfleetby in east Lincolnshire. MAINTENANCE “Well completion continues on the sidetrack well SF7V with clean-up work awaiting coiled tubing due late March,” added the company.  “The intervening time window offers a useful opportunity to perform regular maintenance […]

Finance News Oil & Gas

Angus Energy looks to further £3m debt

Angus Energy plc announced an offer of further funding for drilling and acquisitions as it completed drilling the SF7v sidetrack at Saltfleetby field in east Lincolnshire. FLOW TESTING The sidetrack well reached a total measured depth of 2,746 metres in the Westphalian 1D reservoir. Angus will conduct well clean-up operations in mid-March once coiled tubing […]