Metals & Minerals News

Power Metal notes visible sulphide mineralisation

Power Metal Resources plc reported visible sulphide mineralisation in its first drill hole at the nickel-copper-platinum group element project at Molopo Farms Complex, southwest Botswana. DDH1-6B Drill hole DDH1-6B, within priority target area T1-6, marks the start of a 2,600m drill campaign. The company reached 576m and, after identifying visible sulphide mineralisation, will extend the planned target depth […]

Metals & Minerals News

Power Metal adds third major target for Molopo drill

Power Metal Resources plc has identified a third drill target at its 1,723km2 nickel-copper-platinum group element (PGE) project at Molopo Farms Complex in southwest Botswana. T1-3 Final analyses of MLEM surveys, which previously denoted targets T1-6 and T2-3 as priorities, have also highlighted a “significant ‘jelly-bean’ shaped, geophysical conductor” at target area T1-3. The company said […]

Metals & Minerals News

Power Metal identifies second notable conductor at MFC

Power Metal Resources plc has identified a second large geophysical conductor at the Molopo Farms Complex nickel-copper-platinum group element (PGE) project, southwest Botswana. T2-3 The company previously identified at target area T-16 where two holes are currently being drilled. Power Metal’s most recent findings follow anaylsis of data from ground-based electromagnetic (EM) as well as magnetic […]

Metals & Minerals News

Power Metal starts inaugural drill at Molopo

Power Metal Resources plc has started its inaugural drill programme at the Molopo Farms Complex nickel-copper-platinum group element (PGE) project in southwest Botswana. PROGRAMME The company began diamond core drilling drillhole DDH1-6B targeting a large southerly dipping conductor at priority target T1-6. Site preparations are underway for drilling to start soon on the second drillhole DDH […]

Metals & Minerals News

Power Metal nears drilling 2,600m at Molopo

Power Metal Resources plc soon expects to start drilling a 2,600m strike-length target at its nickel-copper-platinum group element (PGE) Molopo Farms Complex project in Botswana. SURVEY AND MODELLING Ahead of the decision to drill, the company completed a high-resolution ground magnetic (ground-mag) geophysics survey over high priority Target 1-6 (T1-6) covering 2,700m by 1,600m. From […]