Helium One Global Ltd’s joint venture has drilled the intermediate hole section in the Jackson-4 well to 1,123ft (342m) measured depth at the Galactica project in Las Animas County, Colorado, USA. READINGS After cementing the casing, operator Blue Star Helium will undertake a cement bond log to confirm good bonding. The operator will drill further […]