Predator Oil & Gas Holdings plc has submitted the rigless testing work programme for the MOU-1 well at Guercif onshore Morocco. LOGISTICS The well will be tested by France-based Energy Consulting Services (ECS), licensed to use and operate the Sandjet perforating technology. Predator has chosen 18 individual horizons within intervals for testing and may add […]
Tag: Jurassic structural closure
Predator identifies 64m likely gas sands for rigless testing
Predator Oil & Gas Holdings plc highlighted a total 64 metres of likely gas sands, including a likely gas reservoir, in the MOU-4 well due for rigless testing at Guercif, onshore Morocco. INTERVALS Results from NuTech‘s wireline log analysis and reservoir characterisation show from 519 to 713 metres TVD MD including the M1 sands with […]