UK Oil & Gas plc’s joint venture (JV) partner has paused drilling for new seismic data after a directional drilling assembly became stuck in Basur-3 (B3) appraisal oil well in Turkey. DEVIATED SIDETRACK The directional drilling assembly became stuck after the well reached a drilled depth immediately above the Garzan and Mardin targets, which remain […]