Cora Gold Ltd said that drilling results indicated gold mineralisation associated with a possibly massive system on the Tambor gold anomaly at Madina Foulbé in the Kenieba project area, east Senegal. BEDROCK Completed reconnaissance reverse circulation drilling on 10 targets was at a shallow depth into the underlying bedrock on the 3km long by 1.6km […]
Tag: Cora Gold Ltd
Cora identifies gold-bearing structures at Sanankoro
Cora Gold Ltd has identified four primary and four secondary gold bearing structures of around a total 50km of “highly prospective terrain” following sampling at Sanankoro in southern Mali. TARGETS The company said it had outlined 20 new and existing greenfield exploration targets within the structures, which will be ranked in order of priority for […]
Cora finds large-scale potential at Madina Foulbé
Cora Gold Ltd reported potential for large-scale gold mineralisation from reconnaissance reverse circulation drill results on its Madina Foulbé exploration permit in East Senegal. ZONE The permit holds four key target areas and lies within the Kenieba project area. In May the company completed drilling 40 shallow RC holes for 2,018m on the Tambor gold […]
Cora completes drill testing Madina Foulbé
Cora Gold Ltd has completed 2,018m of phase I exploration drilling at the Madina Foulbé gold permit within the Kenieba project area in east Senegal. DEVELOPMENT The permit lies near several tier-1 gold deposits within the Mako geological belt of the Kédougou-Kéniéba Inlier. Results from samples from the reverse circulation over 40 holes are expected […]
Cora to begin Madina Foulbé exploration drill
Cora Gold Ltd is due to begin exploration drilling next week at its 260km2 Madina Foulbé gold permit within the Kenieba project area in east Senegal. TAMBOR Awarded in 2018, the permit is 27km west of the Sadiola gold mine and close to tier 1 deposits of Loulo, Gounkoto and Fekola, within the Kédougou-Kéniéba Inlier […]
Cora starts tendering process for Sanankoro mine
Cora Gold Ltd has begun the tendering process for the front-end engineering and design and construction of the Sanankoro gold mine in southern Mali. BOUNDARIES The company is awaiting the end of Mali government’s November 2022 permit moratorium before formally starting the contract mining process. The application for the Sanankoro mining permit, which includes hybrid […]