Serica Energy plc has quadrupled production from its 24-year-old well in the Bruce field while the Columbus well reached one million barrels of oil equivalent this month. BRUCE In an operations report, the company said that following Serica’s first light well intervention vessel (LWIV) campaign, the initial well (Bruce M1) was re-entered for the first […]
Tag: Bruce field
Serica increases May 2022 production and cash reserves
Serica Energy plc announced strong production and cash position for May 2022 from its gas operations in the UK North Sea. OPERATIONS More than 85% of Serica’s production is gas and its operated North Sea assets provide more than 5% of the UK’s gas production. The month of May saw net production average in excess […]
Serica stops Rhum production due to fault in subsea control module
Serica Energy plc said it had temporarily shut down Rhum production after identifying a fault in the subsea control module. PROGRAMME The company added that there were currently no safety or environmental issues associated with the fault. “A programme to replace the control module is being planned utilising a spare module held in stock. “This […]