Skip to content
Recent News
  • NeoTerra appoints new chairman
  • Arkadian sells Horse Hill asset and files Finnsbo legal action
  • Metals Exploration contractor dies at La India
  • Panther raises £2.22m via first Canadian flow-through
  • Predator raises £2.5m for Guercif-Cory Moruga
Wednesday, October 21, 2026

Extractive Industries

Independent news on Irish and UK junior to mid-tier exploration, development and production

  • About
  • All News
  • Metals & Minerals
  • Oil & Gas
  • Finance
  • Company Moves
  • Legal
  • Equipment
  • ESG
  • Vacancies
ESG News Oil & Gas

Serica nears restart of Rhum R3 gas production

Posted on 11 June 202116 May 2024 Author editorial Comments Off on Serica nears restart of Rhum R3 gas production

Serica Energy plc said the new completion equipment had been installed and a flow test performed at Rhum R3 well in the North Sea.

Analysis: data indicates that the flow potential of the well is at the upper end of Serica’s range of expectation (Serica Energy)

CONSTRAINT

The company added that a stabilised flow rate of 58.4mmscf/d of gas and 135bbls/d of condensate had been achieved.

The rate was constrained by the surface well test equipment on board the WilPhoenix semi-submersible drilling rig.

Serica expects the well to produce at higher rates when in production.

A diving support vessel (DSV) has also been contracted to install the subsea control equipment so the well can start producing during the third quarter of 2021.

RHUM

Chief executive Mitch Flegg added that the volumes flowed during the test were equivalent to over 10,000 boe/d which demonstrated the quality of the Rhum asset.

“It was always expected that the flow test results would be constrained by the surface test equipment, but initial analysis of the data recovered indicates that the flow potential of the well is at the upper end of our range of expectations.

“The third Rhum well will enable enhanced production rates from the field and will provide redundancy to support production from the other two Rhum wells.”

ESGs

Serica said that the recompletion of R3 would increase Rhum’s production capacity by utilising the existing facilities on the Bruce platform.

This would not lead to significant additional CO2 emissions and be in line with the company’s environment, social and governance objectives of reducing the carbon intensity of production.

Serica owns and operates the Bruce (98%), Keith (100%) and Rhum (50%) assets comprising more than 25 wells, three bridge-linked platforms and extensive subsea pipelines and infrastructure that tie-in Rhum, Keith and the Western Area of Bruce to the Bruce facilities.

  • Share
  • Share on X (Opens in new window) X
  • Share on LinkedIn (Opens in new window) LinkedIn

Related

Tagged extractive industries, oil and gas, Rhum R3, Serica Energy plc, UK North Sea

Related Articles

Metals & Minerals News

Power Metal confirms large gold-in-soil anomaly at Tati

Posted on 14 September 20216 February 2024 Author editorial

Power Metal Resources plc confirmed a large scale gold-in-soil anomaly at the Tati project located in the Tati greenstone belt near Francistown, Botswana.  RESULTS The gold anomaly at the Sikukwe Zone was confirmed following laboratory assay testing results of soil and rock samples collected during the company’s Phase I exploration programme. The second batch of samples, including […]

  • Share
  • Share on X (Opens in new window) X
  • Share on LinkedIn (Opens in new window) LinkedIn
Metals & Minerals News

Cadence to increase stake in Amapá iron ore

Posted on 1 November 202228 August 2024 Author editorial

Cadence Minerals plc said it intended to increase its stake from 27% to 30% in the Amapa iron ore project in Brazil. FINANCE The company added it would retain its first right of refusal to acquire 49% of the asset. Cadence will earn the additional 3% through conversion of loans, capitalisation of management, consultancy, and […]

  • Share
  • Share on X (Opens in new window) X
  • Share on LinkedIn (Opens in new window) LinkedIn
Equipment & Logistics Metals & Minerals News

Ormonde notes drill contract for Golden Rose

Posted on 4 April 20254 April 2025 Author editorial

Ormonde Mining plc’s investee has awarded the drill contract to MCL Drilling for a 1,800m drill at the Golden Rose copper-gold project in Central Newfoundland Gold Belt in Canada. STAGHORN Licence holder and operator TRU Precious Metals Corp, in which Ormonde owns 36.3%, plans to test for the first time a pipeline of exploration targets. […]

  • Share
  • Share on X (Opens in new window) X
  • Share on LinkedIn (Opens in new window) LinkedIn

Post navigation

Hurricane bondholders back restructure
Erris scout drilling ‘confirms’ Lead Trial proof of concept
2019 newspaper-lite | Newspaper Lite by themecentury.
Go to mobile version