Hummingbird Resources plc said that the Kouroussa gold mine had achieved commercial production below target due to “lower than expected” mill feed grade. CONSTRAINTS The Guinea project’s four-week trailing average production increased to approximately 1,900 oz, lower than the previously announced target of 2,000-2,500 oz per week. The figure is not expected to ease the […]
...
Kavango to build production plant at Hillside
Kavango Resources plc plans to build a gold production plant to boost production at Prospect 4 within the Hillside project in Matabeleland, southern Zimbabwe. ASSESSMENT Four contract miners currently send “high grade gold mineralisation”, mined on a small scale, 20km to the company’s processing facility at the main site. Kavango said that volumes were at […]
UKOG raises £55,537 via retail offer
UK Oil and Gas plc has raised £55,537 from its retail offer by issuing 222,148,000 new ordinary shares of £0.000001 each at 0.025 pence per share. The offer to the company’s existing retail shareholders is separate to earlier placing which raised £500,000. Following admission UKOG’s voting rights will total 13,362,909,833.
EGT confirms REE mineralisation at Olserum
European Green Transition plc confirmed mineralisation at the Djupedal and Olserum West prospects from its drilling programme at the Olserum rare earth element project in Sweden. CRITICAL The company said results from an additional four drill holes gave evidence of a “district scale REE system”. Results include hole OLS24-06 intersected 2.55m grading 1.6% total rare earth oxides (TREO), of […]
Guardian starts optimising Pilot mine plan
Guardian Metal Resources plc has started developing an optimised mine plan, incorporating recent drilling results, and remodelling its Pilot Mountain tungsten project in Nevada. SUPPORT Assays to date from the first 13 holes includes the best yet intercept of 39.3m @ 0.735% tungsten trioxide, 39.7g/t silver, 0.44% copper and 0.30% zinc from 66m downhole. Results […]
Helium One losses rise in ‘transformational’ year
Helium One Global Ltd’s losses more than quadrupled from a busy year at its operations in southern Rukwa, Tanzania and its new joint venture in Colorado, USA. BUSY Results for year ended 30 June 2024 showed a total comprehensive loss of US$11,012,204 compared with $2,672,915 for the year to 30 June 2023. The company said […]